Skip to content

D C Bhanderi

Infra Project

  • Company
    • About us
    • How We Work
    • Contact Us
  • What We Offer
    • Plan For Permit - (Multiple Lots)
          • – Identify the location of house and driveway in lot

            – Identify disturbed area

            – Identify impervious area

            – Create setback lines as per code compliance

            – Annotate construction easement & drainage easement

            – Identify FFE (Finished Floor Elevation)

            – Create grading of 3:1, 2:1 or flatter

            – Create propose retaining wall, if necessary

    • Plan For Permit - (Large Area)
      • – Mass grading for Existing area

        – Design detention/retention pond

        – Create lot/parcels

        – Create surface on existing topo survey data

    • As Built GPS Submittal
      • – Prepare as built GPS submittal for Department of Transportation

        – Prepare geographic features in shapefile for points, lines, polygons (areas) with attribute tables

        – Prepare Structures shapefile for Storm, sanitary sewer, water line devises

        – Prepare Conveyances shapefile for the trench, swale, pipe culvert, ditch, circular pipe

        – Prepare Polygons shapefile for rip rap zone and any specific area

    • Survey Stake Out
      • – Create Alignment

        – Georeferencing of Cad File

        – Create Feature Line  Attach construction layout/Mainline plan with Cad file to verify exploded cad data.

        – Create points (PNEZD file) and worksheet for following construction elements 

        – Volumetric Surface Creation for Grading 

        – Grading Creation for value engineering 

    • Quantity Take-Off
          • – Estimation of highway and road construction project 

            – Estimation for specialty contractor such as concrete, retaining wall, striping, signal & light installation  

    • Erosion Control Design
      • – Calculate Water Quality Volume 

        – Water Storage Design as per impervious area 

        – Sediment Storage Design as per disturbed area 

        – Propose BMP structures as per requirement of code compliance 

        – Dimension calculations of propose erosion control devices. 

        – Propose dust control on disturbed area if require 

        – Propose grassing slope stabilization 

        – Tree calculations 

    • Infrastructure and Utility Design
      • – Preparation of highway demolition plan 

        – Sanitary sewer system 

        – Storm water management system 

        – Parking lot  

        – Road widening with utilities 

        – Roundabout and intersection design 

    • Permit Plan Preparation
      • – Cover sheet 

        – Index 

        – General notes 

        – Typical section 

        – Summary of quantities 

        – Construction layout Mainline roadway plan and profile 

        – Cross sections 

        – Driveway profile 

        – Special grading plan 

        – Drainage area map and profile 

        – Utility and lighting plan 

        – Signing and marking plan 

        – Special construction details

    • Traffic Control Plan
      • – Prepare and Submit Temporary Traffic Control Plan at per MUTCD

    • ALTA/NSPS Land Survey
  • Projects
    • Plan For Permit – Multiple Lots
    • Plan For Permit – Large Area
    • As Built GPS Submittal
    • Survey Stake Out
    • Design Utility Layout
    • Traffic Control Plan
    • Quantity Take-offs
  • Testimonial

D C Bhanderi

Infra Project

  • Company
    • About us
    • How We Work
    • Contact Us
  • What We Offer
    • Plan For Permit - (Multiple Lots)
          • – Identify the location of house and driveway in lot

            – Identify disturbed area

            – Identify impervious area

            – Create setback lines as per code compliance

            – Annotate construction easement & drainage easement

            – Identify FFE (Finished Floor Elevation)

            – Create grading of 3:1, 2:1 or flatter

            – Create propose retaining wall, if necessary

    • Plan For Permit - (Large Area)
      • – Mass grading for Existing area

        – Design detention/retention pond

        – Create lot/parcels

        – Create surface on existing topo survey data

    • As Built GPS Submittal
      • – Prepare as built GPS submittal for Department of Transportation

        – Prepare geographic features in shapefile for points, lines, polygons (areas) with attribute tables

        – Prepare Structures shapefile for Storm, sanitary sewer, water line devises

        – Prepare Conveyances shapefile for the trench, swale, pipe culvert, ditch, circular pipe

        – Prepare Polygons shapefile for rip rap zone and any specific area

    • Survey Stake Out
      • – Create Alignment

        – Georeferencing of Cad File

        – Create Feature Line  Attach construction layout/Mainline plan with Cad file to verify exploded cad data.

        – Create points (PNEZD file) and worksheet for following construction elements 

        – Volumetric Surface Creation for Grading 

        – Grading Creation for value engineering 

    • Quantity Take-Off
          • – Estimation of highway and road construction project 

            – Estimation for specialty contractor such as concrete, retaining wall, striping, signal & light installation  

    • Erosion Control Design
      • – Calculate Water Quality Volume 

        – Water Storage Design as per impervious area 

        – Sediment Storage Design as per disturbed area 

        – Propose BMP structures as per requirement of code compliance 

        – Dimension calculations of propose erosion control devices. 

        – Propose dust control on disturbed area if require 

        – Propose grassing slope stabilization 

        – Tree calculations 

    • Infrastructure and Utility Design
      • – Preparation of highway demolition plan 

        – Sanitary sewer system 

        – Storm water management system 

        – Parking lot  

        – Road widening with utilities 

        – Roundabout and intersection design 

    • Permit Plan Preparation
      • – Cover sheet 

        – Index 

        – General notes 

        – Typical section 

        – Summary of quantities 

        – Construction layout Mainline roadway plan and profile 

        – Cross sections 

        – Driveway profile 

        – Special grading plan 

        – Drainage area map and profile 

        – Utility and lighting plan 

        – Signing and marking plan 

        – Special construction details

    • Traffic Control Plan
      • – Prepare and Submit Temporary Traffic Control Plan at per MUTCD

    • ALTA/NSPS Land Survey
  • Projects
    • Plan For Permit – Multiple Lots
    • Plan For Permit – Large Area
    • As Built GPS Submittal
    • Survey Stake Out
    • Design Utility Layout
    • Traffic Control Plan
    • Quantity Take-offs
  • Testimonial
  • Company
    • About us
    • How We Work
    • Contact Us
  • What We Offer
    • Plan For Permit – (Multiple Lots)
    • Plan For Permit – (Large Area)
    • As Built GPS Submittal
    • Survey Stake Out
    • Quantity Take-Off
    • Erosion Control Design
    • Infrastructure and Utility Design
    • Permit Plan Preparation
    • Traffic Control Plan
    • ALTA/NSPS Land Survey
  • Projects
    • Plan For Permit – Multiple Lots
    • Plan For Permit – Large Area
    • As Built GPS Submittal
    • Survey Stake Out
    • Design Utility Layout
    • Traffic Control Plan
    • Quantity Take-offs
  • Testimonial

D C Bhanderi

Infra Project

  • Company
    • About us
    • How We Work
    • Contact Us
  • What We Offer
    • Plan For Permit - (Multiple Lots)
          • – Identify the location of house and driveway in lot

            – Identify disturbed area

            – Identify impervious area

            – Create setback lines as per code compliance

            – Annotate construction easement & drainage easement

            – Identify FFE (Finished Floor Elevation)

            – Create grading of 3:1, 2:1 or flatter

            – Create propose retaining wall, if necessary

    • Plan For Permit - (Large Area)
      • – Mass grading for Existing area

        – Design detention/retention pond

        – Create lot/parcels

        – Create surface on existing topo survey data

    • As Built GPS Submittal
      • – Prepare as built GPS submittal for Department of Transportation

        – Prepare geographic features in shapefile for points, lines, polygons (areas) with attribute tables

        – Prepare Structures shapefile for Storm, sanitary sewer, water line devises

        – Prepare Conveyances shapefile for the trench, swale, pipe culvert, ditch, circular pipe

        – Prepare Polygons shapefile for rip rap zone and any specific area

    • Survey Stake Out
      • – Create Alignment

        – Georeferencing of Cad File

        – Create Feature Line  Attach construction layout/Mainline plan with Cad file to verify exploded cad data.

        – Create points (PNEZD file) and worksheet for following construction elements 

        – Volumetric Surface Creation for Grading 

        – Grading Creation for value engineering 

    • Quantity Take-Off
          • – Estimation of highway and road construction project 

            – Estimation for specialty contractor such as concrete, retaining wall, striping, signal & light installation  

    • Erosion Control Design
      • – Calculate Water Quality Volume 

        – Water Storage Design as per impervious area 

        – Sediment Storage Design as per disturbed area 

        – Propose BMP structures as per requirement of code compliance 

        – Dimension calculations of propose erosion control devices. 

        – Propose dust control on disturbed area if require 

        – Propose grassing slope stabilization 

        – Tree calculations 

    • Infrastructure and Utility Design
      • – Preparation of highway demolition plan 

        – Sanitary sewer system 

        – Storm water management system 

        – Parking lot  

        – Road widening with utilities 

        – Roundabout and intersection design 

    • Permit Plan Preparation
      • – Cover sheet 

        – Index 

        – General notes 

        – Typical section 

        – Summary of quantities 

        – Construction layout Mainline roadway plan and profile 

        – Cross sections 

        – Driveway profile 

        – Special grading plan 

        – Drainage area map and profile 

        – Utility and lighting plan 

        – Signing and marking plan 

        – Special construction details

    • Traffic Control Plan
      • – Prepare and Submit Temporary Traffic Control Plan at per MUTCD

    • ALTA/NSPS Land Survey
  • Projects
    • Plan For Permit – Multiple Lots
    • Plan For Permit – Large Area
    • As Built GPS Submittal
    • Survey Stake Out
    • Design Utility Layout
    • Traffic Control Plan
    • Quantity Take-offs
  • Testimonial

D C Bhanderi

Infra Project

  • Company
    • About us
    • How We Work
    • Contact Us
  • What We Offer
    • Plan For Permit - (Multiple Lots)
          • – Identify the location of house and driveway in lot

            – Identify disturbed area

            – Identify impervious area

            – Create setback lines as per code compliance

            – Annotate construction easement & drainage easement

            – Identify FFE (Finished Floor Elevation)

            – Create grading of 3:1, 2:1 or flatter

            – Create propose retaining wall, if necessary

    • Plan For Permit - (Large Area)
      • – Mass grading for Existing area

        – Design detention/retention pond

        – Create lot/parcels

        – Create surface on existing topo survey data

    • As Built GPS Submittal
      • – Prepare as built GPS submittal for Department of Transportation

        – Prepare geographic features in shapefile for points, lines, polygons (areas) with attribute tables

        – Prepare Structures shapefile for Storm, sanitary sewer, water line devises

        – Prepare Conveyances shapefile for the trench, swale, pipe culvert, ditch, circular pipe

        – Prepare Polygons shapefile for rip rap zone and any specific area

    • Survey Stake Out
      • – Create Alignment

        – Georeferencing of Cad File

        – Create Feature Line  Attach construction layout/Mainline plan with Cad file to verify exploded cad data.

        – Create points (PNEZD file) and worksheet for following construction elements 

        – Volumetric Surface Creation for Grading 

        – Grading Creation for value engineering 

    • Quantity Take-Off
          • – Estimation of highway and road construction project 

            – Estimation for specialty contractor such as concrete, retaining wall, striping, signal & light installation  

    • Erosion Control Design
      • – Calculate Water Quality Volume 

        – Water Storage Design as per impervious area 

        – Sediment Storage Design as per disturbed area 

        – Propose BMP structures as per requirement of code compliance 

        – Dimension calculations of propose erosion control devices. 

        – Propose dust control on disturbed area if require 

        – Propose grassing slope stabilization 

        – Tree calculations 

    • Infrastructure and Utility Design
      • – Preparation of highway demolition plan 

        – Sanitary sewer system 

        – Storm water management system 

        – Parking lot  

        – Road widening with utilities 

        – Roundabout and intersection design 

    • Permit Plan Preparation
      • – Cover sheet 

        – Index 

        – General notes 

        – Typical section 

        – Summary of quantities 

        – Construction layout Mainline roadway plan and profile 

        – Cross sections 

        – Driveway profile 

        – Special grading plan 

        – Drainage area map and profile 

        – Utility and lighting plan 

        – Signing and marking plan 

        – Special construction details

    • Traffic Control Plan
      • – Prepare and Submit Temporary Traffic Control Plan at per MUTCD

    • ALTA/NSPS Land Survey
  • Projects
    • Plan For Permit – Multiple Lots
    • Plan For Permit – Large Area
    • As Built GPS Submittal
    • Survey Stake Out
    • Design Utility Layout
    • Traffic Control Plan
    • Quantity Take-offs
  • Testimonial
  • Company
    • About us
    • How We Work
    • Contact Us
  • What We Offer
    • Plan For Permit – (Multiple Lots)
    • Plan For Permit – (Large Area)
    • As Built GPS Submittal
    • Survey Stake Out
    • Quantity Take-Off
    • Erosion Control Design
    • Infrastructure and Utility Design
    • Permit Plan Preparation
    • Traffic Control Plan
    • ALTA/NSPS Land Survey
  • Projects
    • Plan For Permit – Multiple Lots
    • Plan For Permit – Large Area
    • As Built GPS Submittal
    • Survey Stake Out
    • Design Utility Layout
    • Traffic Control Plan
    • Quantity Take-offs
  • Testimonial

Projects

Plan for Permit - Multiple Lots

Visit Project

Plan for Permit - Large Area

Visit Project

As Built GPS Submittal

Visit Project

Survey Stake Out

Visit Project

Design Utility Layout

Visit Project

Traffic Control Plan

Visit Project

Quantity Take-offs

Visit Project

D C Bhanderi Infra Project

  • USA
    • 816 Norwalk Cv
      Lawrenceville GA 30043
  • INDIA
    • A 55 Shreedhar Bunglows, Nikol, Ahmedabad, Gujarat, India – 382350
  • +91 63596 48321
  • office@dcbip.in

What We Offer

  • Plan For Permit
  • As Built GPS Submittal
  • Survey Stake Out
  • Quantity take-off
  • Erosion Control Design
  • Infrastructure and Utility Design
  • Permit Plan Preparation
  • Traffic Control Plan
  • ALTA/NSPS Land Survey

Our Company

  • About Us
  • How We Work
  • Our Team
  • Contact Us

News&Letter