What We Offer

Land Development Plan for Permit

(Multiple Lots)

Land Development Plan for Permit – (Multiple Lots)

– Identify the location of house and driveway in lot

– Identify disturbed area

– Identify impervious area

– Create setback lines as per code compliance

– Annotate construction easement & drainage easement

– Identify FFE (Finished Floor Elevation)

– Create grading of 3:1, 2:1 or flatter

– Create propose retaining wall, if necessary

Land Development Plan for Permit

(Large Area)

Land Development Plan for Permit – (Large Area)

– Mass grading for Existing area

– Design detention/retention pond

– Create lot/parcels

– Create surface on existing topo survey data

As Built GPS Submittal by using ESRI ArcGIS

 

As Built GPS Submittal by using ESRI ArcGIS

– Prepare as built GPS submittal for Department of Transportation

– Prepare geographic features in shapefile for points, lines, polygons (areas) with attribute tables

– Prepare Structures shapefile for Storm, sanitary sewer, water line devises

– Prepare Conveyances shapefile for the trench, swale, pipe culvert, ditch, circular pipe

– Prepare Polygons shapefile for rip rap zone and any specific area

Construction Calculations for Survey Stake Out of Highway Projects

 

Construction Calculations for Survey Stake Out of Highway Projects

– Create Alignment

– Georeferencing of Cad File

– Create Feature Line  Attach construction layout/Mainline plan with Cad file to verify exploded cad data.

– Create points (PNEZD file) and worksheet for following construction elements 

– Volumetric Surface Creation for Grading 

– Grading Creation for value engineering 

Quantity Take-off

 

Quantity Take-off

Estimation of highway and road construction project 

– Estimation for specialty contractor such as concrete, retaining wall, striping, signal & light installation  

Erosion Control Design

 

Erosion Control Design

– Calculate Water Quality Volume 

– Water Storage Design as per impervious area 

– Sediment Storage Design as per disturbed area 

– Propose BMP structures as per requirement of code compliance 

– Dimension calculations of propose erosion control devices. 

– Propose dust control on disturbed area if require 

– Propose grassing slope stabilization 

– Tree calculations 

Infrastructure and Utility Design

 

Infrastructure and Utility Design

– Preparation of highway demolition plan 

– Sanitary sewer system 

– Storm water management system 

– Parking lot  

– Road widening with utilities 

– Roundabout and intersection design 

Permit Plan Preparation

 

Permit Plan Preparation

Cover sheet 

– Index 

– General notes 

– Typical section 

– Summary of quantities 

– Construction layout Mainline roadway plan and profile 

– Cross sections 

– Driveway profile 

– Special grading plan 

– Drainage area map and profile 

– Utility and lighting plan 

– Signing and marking plan 

– Special construction details

Preparation of Traffic Control Plan

 

Preparation of Traffic Control Plan

– Prepare and Submit Temporary Traffic Control Plan at per MUTCD

ALTA/NSPS Land Survey